To the central content area

2008Pingtung County, river dredging and sand control field inspection program

Absrtact
Abstract 1. Checking and Governing Pingtung County governs 62 sand and gravel processing plants, wherein 47 plants are under normal operation, 15 plants have been shut down and 3 plant has been cleared up. Facilities of Sand and Gravel Processing Plant include 75 soil and stone warehouses, 24 sets of sieve, 64 sets of jaw crusher, 190 sets of vibrating sieve, 125 sets of cone crusher, 118 sets of stone and sand washing machine, 56 stone depots and581 pieces of conveying belt. As to pollution prevention facilities, 62 plants have been equipped with watering machine, 1 shutdown plants have got into trouble; 62 plants have been equipped with washing equipment, 4 shutdown plants have got into trouble, 1 shutdown plants have not yet equipped; 63 plants have established stores at entrance of plant, stores of 1 shutdown plants have been damaged and one shutdown plant has not built stores at all; 50 plants have built fence, and fence of 2 shutdown plants have been damaged, another 9 shutdown plants have not built and 7 operating plants have also not built; 60 plants equipped with crusher have all installed water-jetting equipment. 2. Follow-on Control 57 plants which have not reached the grade 3 governing standard have been screened out as the follow-on controlled plant after a complete check. Owing to the tutorship and recovery of pollution prevention facilities, plants answering to the grade 3 governing standard have reached 41 plants from the primary 0 plants, and plants of grade 2 have been reduced to 6 from 57 plants, all plants can now build and operate the pollution prevention establishments. 3. Control of Source of Raw Materials and Establishment of Regulations on Material Yard within Plants Sand and gravel stored in Pingtung County are about 2.326 million m3, 43 plants of the 62 governed sand and gravel processing plants have at present stored sand gravel in plant area, wherein 10 plants have stored over one month, 35 plants have covered dustproof net over non-operating zone, 2 plants have planted the non-operating zone , 2 plants have been planting and watered the bared land of operating area at fixed time, 19 plant without any gravel Duizhi raw materials, of which 8 gravel for the raw materials into the plant immediately after the broken washing, and 11 for the lay-off status. 4. Pollution Reduction Operating For this year's inventory found that the 4 set up a new gravel field and set up last year after a lay-off, this year's resumption of work on the gravel field, for counseling to reduce negotiations to assess the implementation of targeted operations. The new set of salt Po Woo Kwok-hing Rural Industrial Co., Ltd., and rural Sinpi Hui-yun social enterprises, the development of broad-wing Enterprises Limited, Banten rural Le Shi Industrial Co., Ltd. and set up 94 years after the resumption of work lay-off this year's high Heung Shu-feng Limited gravel, and so on up to 5 for evaluation. As of 11/30 on the completion of counseling were only suitable site to set anti-pollution equipment. 5. To Push Forward the Maintenance for Connecting Transportation Systems In this column counseling program continued to control the market for sand and gravel plant outreach adopt the road outside, the scope of the individual to adopt at least before the plant around the side of 50-100 meters; adopted include daily watering on a regular basis to clean the roads and road maintenance, and so on a regular basis . Up to date 11/30 counseling to complete a total of 20 roads to the outside, the length of 23.2 km of the work of adoption. 6. A demonstrative promotion of planting green segregation zones Up to date 11/30, the plan to promote green sand and gravel to reduce carbon market, including to help businesses apply for Zhizai and counseling industry Zhizai the purchase of its own, to complete a total of 5200 seedlings planted counseling; if calculated based on the Environmental Protection Notice Zhizai CO2 Reduction, estimated that the total CO2 absorption for the stock of 37,960 kg / year. 7. Pingtung County to develop a stationary source of particulate matter oven facilities management elements Control June to complete the development, "Pingtung County oven stationary sources of pollution of particulate matter control facilities management elements" of the draft and fully discussed with the Environmental Protection Agency confirmed that after the contents of the main points. The main points of the object for the control of the county public and private places Duizhi, handling, transportation, transportation of minerals, rocks, gravel, slag, and other pollutants and other Yizhi particulate matter of the oven and territories to engage in the exploitation of quarries, manufacturing operations And oven-like pollutants in danger, are the main points of the application of this provision. This point was 7 / 10 invited to complete the processing industry a public hearing on the county to send the rule of law approved by the chamber, to be approved, the notice will be implemented. 8. River Dredging and Pollution Control In the current year, there are 9 central-monitored and county-monitored river and steam dredging distribution and interactive dredging projects being completed, with 97 river and stream irrigation volume projected at 4.087 million metric meters. As of November 30, the total dredging volume of rivers and streams came to 1.986 million metric meters, and the number of gravel transport trucks estimated at 141,871 vehicle dispatches. A total of 3 river/stream developmental dredging projects have been completed through installing truck hosing equipment, truck hosing equipment malfunction repair, and the addition of sprinkler vehicles to enforce the sprinkling work, together with asphalt laying on transport access roads, repairing damaged transport access roads, enforcing the dust cover on transport trucks and so forth for improving traffic dust. 9. To Establish Response System for Defective Air Quality of Sand and Gravel Processing Plant The current year has enlisted the gravel site poor air quality response mechanism as a promotional focus, under which the initial stage of the project calls for communicating and coordinating with the operators, and explaining to the gravel operators the importance of the poor air quality response mechanism, as well as a broad-based campaigning for poor air quality response measures, which would avail the operators to understand how best to collaborate with the environmental protection agencies in conducting an onsite pollution source response mechanism at the onset of poor or deteriorating air quality levels. From the initial stage of the project up to November 30, a total of 10 poor PM air quality forecast have been reported at the air quality monitoring statements, and 7 PM poor real-time reporting made, in which the program has consistently been able to support the onsite audit by activating the poor air quality response mechanism. The onsite audit findings show that the participating gravel sites are able to support the program’s poor air quality response measures. 10. Drainage and Reduction The project, upon completing the audit work, has uploaded the latest updated information of the “stationary pollution source control plan” onto the “stationary air pollution source management information system” database for updating the TSP discharge estimate4, which put the TSWP discharge volume on the 69 gravel sites enlisted for monitoring at 2,071 tons / year. The calculation of the discharge volume of the river/stream dredging project has the discharge volume estimated based on the audit findings deriving from the construction site pollution control plan using the Environmental Protection Administration’s “Construction site pollution control and surcharge management information system”. As of November 30, the county has completed the dredging work on a total of three river/stream dredging projects, with a total discharge volume tallied at 17.30 tons/ year. The current year’s source volume reduction at gravel sites (plants) primarily calls for spearheading the operators to add pollution prevention equipment and improvement of the exposed grounds. As per the project implementation as of November 30, the reduction volume derived from computing the volume reduction efficiency by various prevention equipment came to 390.62 tons/ year,, the improved reduction volume on exposed grounds came to 12.47 tons/year, the reduction volume from the river/stream dredging projects came to 18.92 tons/ year, putting the total reduction volume at 409.54 tons/ year.
Keyword
sandstone field, sandstone field control
Open
top